Question 2 (b)

Acceptance sampling of chipsets: accept, second sample or reject (binomial)

9 marks

Time to write
About 18 minutes
Topic
Binomial and Poisson distributions

Question

Question 2 (b) · 9 marks

On average, a machine produces 10% defective chipsets. When the quality manager visits to inspect, a batch is accepted if a sample of 7 chipsets drawn from it contains no defective chipsets, and rejected if the sample contains 3 or more defectives. Otherwise, a second sample is taken for a quality check by the manager. What is the probability that:

  1. The batch will be accepted,

  2. A second sample will be drawn,

  3. The batch will be rejected.

Reworded from the university paper: names and figures differ, the task is the same. The original paper belongs to the University of Delhi. See DU's question bank.

Before you write

Read off the question and its marks

18 minfor 9 marks

Write it in this order

A step that gives the answer away stays hidden: tap it to see it.

  1. Read the data; note exactly what is asked 1 min
  2. 1 Binomial model, parameters and the decision rule 2 marks 4 min
  3. 2 (i) Probability that the batch is accepted 2 marks 4 min
  4. 3 (ii) Probability that a second sample is drawn 2½ marks 4 min
  5. 4 (iii) Probability that the batch is rejected 2½ marks 4 min
  6. Check: arithmetic, units (₹, %), final answer underlined 1 min

Try it first. About 18 minutes for 9 marks. Write it out, then open the solution.

Solution

Hover or tap a marked figure, like 72,000, to see how it is made and where else it appears.

The distribution. Each of the 7 chipsets in the sample is either defective (a success for this count) or not, with the same chance p = 10% = 0.1 of being defective, and one chipset's condition does not affect another's. The number X of defectives in the sample is therefore binomial, X ~ B(7, 0.1), with q = 1 − p = 0.9 and P(X = x) = ⁷Cₓ pˣ q⁷⁻ˣ, x = 0, 1, …, 7. (The batch is taken to be large compared with the sample, so the chance of a defective stays the same from one chipset to the next.)

The quality manager's rule splits the values of X into three decisions:

  • X = 0: accept the batch;
  • X = 1 or 2: draw a second sample;
  • X ≥ 3: reject the batch.

Working table (probabilities to 4 decimal places)

x defectives⁷Cₓpˣ q⁷⁻ˣP(X = x)Decision
01(0.9)⁷ = 0.47830.4783Accept
17(0.1)(0.9)⁶ = 0.05310.372Second sample
221(0.1)²(0.9)⁵ = 0.00590.124Second sample
3 or more1 − (sum of the rows above)0.0257Reject
Total1

(i) The batch is accepted

P(X = 0) = (0.9)⁷ = 0.4783.

(ii) A second sample is drawn

P(X = 1 or 2) = P(X = 1) + P(X = 2) = 7 × 0.1 × 0.531441 + 21 × 0.01 × 0.59049 = 0.372 + 0.124 = 0.496.

(iii) The batch is rejected

P(X ≥ 3) = 1 − [P(X = 0) + P(X = 1) + P(X = 2)] = 1 − (0.4783 + 0.372 + 0.124) = 1 − 0.9743 = 0.0257.

The three decisions are mutually exclusive and cover every possible sample, so their probabilities add up to 1 (0.4783 + 0.496 + 0.0257 = 1).

Comment. With a 10% defective rate, fewer than half of the batches (about 48%) pass on the first sample, about half (49.6%) need a second sample, and only about 2.6% are rejected outright. The mean number of defectives in a sample of 7 is np = 7 × 0.1 = 0.7, which is why one or two defectives are so common and the second sample is drawn so often.

Where the 9 marks sit

#ComponentMarks
1Binomial model, parameters and the decision rule2
2(i) Probability that the batch is accepted2
3(ii) Probability that a second sample is drawn2.5
4(iii) Probability that the batch is rejected2.5
Total9
Keyboard: ← → previous and next question, / search

Report a problemopens an email to admin@getkunji.com with the question ID7502-Q2balready filled in.