Question 3 (b)
Estimated cost and standard cost distinguished
6 marks
- Time to write
- About 12 minutes
- Topic
- Standard costing
Question
Question 3 (b) · 6 marksDistinguish 'Estimated Cost' from 'Standard Cost'.
Reworded from the university paper; the task is the same. The original paper belongs to the University of Delhi. See DU's question bank.
Before you write
Read off the question and its marks
Read from the question
- DistinguishSet the differences out in a table, basis by basis, not as two separate essays.
Write it in this order
- Read; underline the asks; jot your points 1 min
- 1 Estimated cost explained 2 marks 3 min
- 2 Standard cost explained 2 marks 3 min
- 3 Differences 2 marks 3 min
- Check: every ask answered, key terms underlined 2 min
Short on time? Trim steps 1–3 evenly rather than skip one: each is capped at its own marks.
Try it first. About 12 minutes for 6 marks. Write it out, then open the solution.
Solution
Hover or tap a marked figure, like 72,000, to see how it is made and where else it appears.
An estimated cost is a reasonable forecast of what a cost is likely to be, made before production on the basis of past experience, adjusted for expected changes in prices and conditions. Estimates are used mainly for quoting prices, preparing tenders and making rough plans. They indicate what a cost will be.
Example: a contractor estimates the cost of building a warehouse from the costs of similar past jobs plus expected price rises, and quotes a price on that basis.
A standard cost is a predetermined cost, scientifically set by technical and cost studies, of what a unit of product or service should cost under efficient operating conditions. Standards are set for material quantity and price, labour time and rate, and overheads, and are used to control costs by comparing actual costs with them and analysing variances.
Example: a standard of 2 kg of material at ₹50 per kg and 1.5 labour hours at ₹200 per hour is set for one unit; actual usage of 2.2 kg shows an adverse usage variance.
Both are predetermined costs, which is why they are often confused; the difference lies in how they are set and what they are used for.
| Basis | Estimated cost | Standard cost |
|---|---|---|
| Meaning | What a cost will probably be | What a cost should be under efficient conditions |
| Basis | Past experience and judgment | Scientific study (time and motion, engineering, market studies) |
| Accuracy | Less accurate, approximate | More precise |
| Purpose | Price quotation, tenders, rough planning | Cost control, performance measurement, budgeting |
| Emphasis | Realistic expectation | Target of efficiency |
| Use in the accounts | Generally not entered in the accounts | Can be built into the accounting system (standard costing) |
| Variances | Not usually analysed | Variances analysed by cause and responsibility |
| Scope | Can be used for a single job or contract | Used for repetitive, standardised production |
Where the 6 marks sit
| # | Component | Marks |
|---|---|---|
| 1 | Estimated cost explained | 2 |
| 2 | Standard cost explained | 2 |
| 3 | Differences | 2 |
| Total | 6 |