Question 2 OR (g)

Probability that the contractor gets both contracts

6 marks

Time to write
About 12 minutes
Topic
Probability and Bayes' theorem

Question

Question 2 OR (g) · 6 marks

A contractor has two potential contracts, namely an electrification contract and a plumbing contract. The probability of the contractor getting the electrification contract is 4/7. The probability of the contractor not getting the plumbing contract is 7/10. The probability of the contractor getting at least one of the contracts is 7/9. Find the probability of the contractor getting both contracts.

Reworded from the university paper: names and figures differ, the task is the same. The original paper belongs to the University of Delhi. See DU's question bank.

Before you write

Read off the question and its marks

12 minfor 6 marks

Read from the question

  • FindFormula first, then the working, then the answer with its unit (₹, %, units).

What the paper leaves open

The three probabilities are printed as stacked fractions; they are written here as a/b.

Write it in this order

  1. Read the data; note exactly what is asked 1 min
  2. 1 Events and the probability of the plumbing contract 1½ marks 2 min
  3. 2 Addition theorem and P both contracts 3½ marks 6 min
  4. 3 Check through the four outcomes 1 mark 2 min
  5. Check: arithmetic, units (₹, %), final answer underlined 1 min

Short on time? Step 2 carries 3½ of the 6 marks: guard its minutes.

Try it first. About 12 minutes for 6 marks. Write it out, then open the solution.

Solution

Hover or tap a marked figure, like 72,000, to see how it is made and where else it appears.

Events. Let E be the event that the contractor gets the electrification contract and P the event of getting the plumbing contract. Given:

  • P(E) = 4/7;
  • P(not P) = 7/10, so P(P) = 1 − 7/10 = 3/10, because an event and its complement have probabilities adding to 1;
  • P(E ∪ P) = 7/9 (at least one contract).

Probability of getting both contracts

The addition theorem for any two events, P(E ∪ P) = P(E) + P(P) − P(E ∩ P), gives P(E ∩ P) = P(E) + P(P) − P(E ∪ P):

P(E ∩ P) = 4/7 + 3/10 − 7/9.

With the common denominator 630 (= 7 × 10 × 9):

P(E ∩ P) = 360/630 + 189/630 − 490/630 = 59/630 ≈ 0.0937.

The probability that the contractor gets both contracts is 59/630, a little under 1 in 10. The figure is a valid probability: it is positive and smaller than both P(E) = 360/630 and P(P) = 189/630.

Check through all the outcomes.

OutcomeWorking (in 630ths)Probability
Both contracts360 + 189 − 490 = 5959/630
Electrification only360 − 59 = 301301/630
Plumbing only189 − 59 = 130130/630
Neither contract630 − 490 = 140140/630
Total630/630 = 1

Where the 6 marks sit

#ComponentMarks
1Events and the probability of the plumbing contract1.5
2Addition theorem and P(both contracts)3.5
3Check through the four outcomes1
Total6
Keyboard: ← → previous and next question, / search

Report a problemopens an email to admin@getkunji.com with the question ID872-Q2gORalready filled in.